Minden Real Estate

Business Updates for the Real Estate Industry

Discover Electricity

Subdivision procedure to perform better for the seller. Information about the terrain before you buy a piece of land, contact the local authority to provide more complete information about the proposed land sites. It is useful to get acquainted with the land registry data, the results of monitoring, planning, reservations, zoning of land. Additional information is available at author. Also talk to your future neighbors over land development region as a whole. Water area Water supply to the house can be from a collective (or city, village water supply) or an individual source (well, well). Often the customer site, without access to water supply networks, thinks that the drill at the site easily. But in reality things are not so simple.

Many suburban areas have a significant drawback – sometimes drill wells deep 60-80 m to get to the water. It could cost you $ 8000 or more. So that the comparative cheapness of land due to the presence of massive granite boulders in the thickness of the soil, preventing access to water. If the quality of the water next to your the site has already drilled wells, ask the owners of wells and data conclusion of SES for the content of bacteriological and chemical contaminants in water. Usually in the wells of 20 m and deeper bacterial contamination No water. Soils in the area you need to know is to determine the type of foundation of the future house. The study of soils is desirable to do before purchasing land. This is especially true when you offer suspiciously cheap land in attractive area.

In some regions, to find land for construction of the ideal soil is almost impossible. Architects know this and are always ready to offer a set of Technical solutions to neutralize the adverse effects of soil. The ground water level is Prone to flooding in the area during the flood? Drill hand drill with a spade or a few shallow wells on the site. If after an hour in the pits will hold water, ground water level in the area is too high. Ask neighbors and about the period of spring floods and rains fall, not whether the local flooded the earth? If groundwater level is high, and floods are abundant, to the cellar, basement or underground garage is better not count, unless you are willing to invest some serious money in the waterproofing of the building. If communal sewers a communal sewage system, the question immediately removed. Just need to get a permit to discharge wastewater in accordance with the needs of your future home and the possibilities of the networks themselves. If there is no settlement communications should reflect on local systems. Electricity Discover the site where the nearest substation, many kilowatts you can distinguish legally in the local administration. Rate consumption of the average home area of 200-300 square meters. m – 20-30 kW. However, the existing norms on one house stands out not more than 9,6 kW. Therefore, prospective homeowners must include in their articles on their own expenses the costs substation or plant. Of course, these requirements may seem strict, but this is the best site that it is desirable to choose to build. After all, you can not select parts annually, houses, villas and cottages are built, so in such a matter is important, not speed, and quality. Collect all of your patience and come to the site selection is responsible.